000T | IM 0291(102)0 | 2850 | 12/25/2099 | 383213.000 | Chain Link Fence | |
001C | IM 0906(00)2843 | 2132 | 12/25/2099 | 0.000 | Pavement Restoration | |
001E | P 6042(00) | 4055 | 4/30/2024 | 0.000 | Str & Approach Grading- For Training Purposes Only (Not For Construction) | |
00AQ | 0043-041 | 1770 | 4/13/2005 | 148694.130 | SPOT ASPHALT CONCRETE RESURFACING (PATCHING) ON HWY 16A MP 31.1 TO 39.9 AND HWY 87 MP56.1 TO 57.8 | |
00L6 | P 0034(122)123 | 2441 | 12/25/2099 | 471401.000 | Bank Stabilization | |
00QM | PS 0018(130)62 | 4849 | 12/25/2099 | 156438.000 | Railroad Crossing Detour | |
00QR | BRO 8027(29) | 6222 | 9/30/2017 | 0.000 | Structure & Approach Grading (2-13'x6' RCBC) | |
00XM | P 0047(111)203 | 8756 | 3/16/2022 | 15779720.030 | Grading, Interim Surfacing, Replace Structure (7x4 CIP or Precast RCBC, 4-12x12 CIP RCBC, 3-10x7 CIP or Precast RCBC) | |
00Y5 | PH 000S(161) | 2274 | 8/4/2011 | 793150.000 | Contractor Test Letting | |
00YC | PH 000S(182) | 2577 | 12/25/2099 | 0.000 | Safety Project | |
00YE | PH 1400(17) | 7780 | 5/1/2019 | 0.000 | Grading, Curb & Gutter, Storm Sewer, Lighting, Traffic Signals, Asphalt Concrete Surfacing & PCC Surfacing | |
0181 | 037-151 | 2486 | 12/25/2099 | 0.000 | Structure And Approach Grading | |
018K | HR-IM Z618(01) | 3080 | 12/25/2099 | 2078052.000 | Weigh-In-Motion System and Weigh Scale Site Expansion | |
019K | BRF 0050(76)425 | 2795 | 12/25/2099 | 0.000 | Replace Structure - Let by State of Iowa | |
01C9 | IM 0291(105)59 | 2844 | 12/25/2099 | 343026.000 | Replace Interstate Fence | |
01DX | BRF 6140(08) | 8024 | 3/16/2022 | 1344500.200 | Structure (92' Prestressed Girder Bridge) & Approach Grading | |
01KE | NH 016B(01)64 | 2552 | 12/25/2099 | 0.000 | Asphalt Surface Treatment, Pavement Marking | |
01MD | IM 0901(151)0 | 3407 | 12/25/2099 | 499493.000 | 2010 Region Let Fencing Jobs | |
01PR | NH 0018(155)43 | 2788 | 12/25/2099 | 0.000 | Mill and AC Resufacing | |
01PU | P 6366(04) | 4249 | 12/25/2099 | 0.000 | Roadway Stability Repair | |
01QB | ES 0018(158)32 | 3156 | 12/25/2099 | 0.000 | Mill & AC Overlay & ADA Upgrades | |
01U0 | P 0041(10) | 2837 | 4/15/2009 | 823975.550 | Joint Resealing, Sealing Random Cracks, Guardrail Replacement, & PCC Pavement Repair | |
01UH | PH 000S(235) | 4262 | 12/25/2099 | 0.000 | Durable Pavement Marking | |
01V6 | NH-TA 0100(108)407 | 9054 | 5/3/2023 | 47933520.320 | Grading, Structure (172' Prestressed Girder, 12x10 CIP RCBC), MSE Retaining Wall, PCC Surfacing, Curb & Gutter, Storm Sewer, | |
01V7 | NH 0100(106)409 | 9663 | 2/12/2025 | 40996599.810 | Grading, Structure's (2-12x5 Precast RCBC, (2)12x10 CIP RCBC, 196.5' Steel Girder, 2-11x5 CIP RCBC, 9x5 Precast RCBC), PCC Su | |
01X9 | IM 0905(94)218 | 2857 | 12/25/2099 | 0.000 | Modify Rest Area & ADA Upgrade | |
01XC | IM 0901(156)0 | 2842 | 12/25/2099 | 43500.000 | Modify Rest Area | |
01Z6 | P 0247(06)172 | 2934 | 12/25/2099 | 793048.000 | Inslope Repair | |
020V | EM 0295(45)130 | 8566 | 11/17/2021 | 15305307.530 | Construct Interchange, Grading, Structure (260' Prestressed Girder), Lighting | |
0219 | P 0014( )421 | 6198 | 8/14/2018 | 380126.000 | Intersection Improvement (Dual Left Turn Lane) | |
021C | IM 0190( )00 | 4875 | 8/14/2018 | 1397016.000 | Remove & Replace PCC | |
021G | IM-FP-PP-B 0901(195)35 | 8776 | 5/11/2022 | 35035743.840 | Grading, PCC Surfacing, Replace Str (278' Steel Girder, 2-7x6 CIP, 20x10 CIP, LongSpan Arch Ext., 3-8x4 CIP, 9x8 Precast), T | |
026Z | NH-CR 0014(185)229 | 9383 | 12/11/2024 | 26410308.580 | Urban Grading, Curb & Gutter, Sidewalk, Signals, Storm Sewer, Lighting, Asphalt Concrete Surfacing, PCC Surfacing | |
029L | P 0045(45)82 | 4676 | 12/25/2099 | 0.000 | Scour Protection | |
02C7 | PH 000S(222) | 4352 | 12/25/2099 | 0.000 | Install Rumble Strips | |
02CF | PH 000S(230) | 4431 | 12/25/2099 | 0.000 | Rumble Strips and Rumble Stripes | |
02CN | P SRTS(08) | 2802 | 12/25/2099 | 159544.000 | Testing | |
02FG | P 3698(02) | 4699 | 5/21/2014 | 1088332.000 | Asphalt Concrete, Base Course, Storm Sewer, Curb & Gutter, Sidewalk, Signing | |
02GR | P 0014(170)113 | 3166 | 12/25/2099 | 0.000 | Chip Seals | |
02GV | NH-P 0011(64) | 3578 | 12/25/2099 | 0.000 | Joint and Spall Repair | |
02J1 | EM 8040(16) | 5042 | 12/25/2099 | 197181.000 | Shared Use Path | |
02JE | P-ER 7701(03) | 3235 | 12/25/2099 | 436134.000 | Ground Anchor Retaining Wall | |
02JK | NH 0034(00)35 | 4279 | 12/25/2099 | 144770.000 | Land Slide Repair | |
02PX | IM 0901( )10 | 4877 | 8/13/2018 | 1623738.000 | Grading and PCCP Surfacing | |
02PZ | IM 0901( )12 | 4878 | 8/13/2018 | 298001.000 | Partial Interchange Lighting | |
02W6 | P 0089(09)30 | 3905 | 12/25/2099 | 0.000 | Asphalt Surface Treatment (Chip Seal) | |
02WD | P 0041(14) | 3955 | 12/25/2099 | 0.000 | Asphalt Concrete Crack Sealing | |
0335 | P 6155(10) | 4170 | 12/25/2099 | 0.000 | Grind & Process in Place | |
034U | IM 0907(77)309 | 4350 | 10/2/2013 | 437566.000 | Box Culvert Extensions | |
035F | IM 0902(18)101 | 9482 | 9/4/2024 | 15096437.980 | Replace Structure ((2) 394.5' Prestressed Girder Bridges), Approach Grading, Asphalt Surfacing | |
03BD | NH-PH 0385(50)96 | 9238 | 10/18/2023 | 23492147.290 | Grading, Structures ((2) 8x10 Precast RCBC, 3-10x7 CIP RCBC, 2-10x10 CIP RCBC), Interim Surfacing & Pipe Work | |
03C2 | P SRTS(18) | 4648 | 12/25/2099 | 262652.000 | PCC Sidewalk & Pavement Marking | |
03C3 | P SRTS(19) | 4208 | 12/25/2099 | 130936.000 | Safe Routes to School | |
03C4 | P SRTS(20) | 4210 | 12/25/2099 | 195401.000 | Safe Routes to School | |
03C5 | P SRTS(21) | 4327 | 12/25/2099 | 69951.000 | Safe Routes to School | |
03C6 | P SRTS(22) | 4209 | 12/25/2099 | 329646.000 | Safe Routes to School | |
03J6 | P 1806(14)164 | 4072 | 12/25/2099 | 0.000 | Pipe Lining & Erosion Repair | |
03K0 | NH-P 0021(100) | 4286 | 12/25/2099 | 0.000 | Rout and Seal Cracks | |
03R6 | IM 0299(73)232 | 9457 | 5/1/2024 | 1496043.800 | Paint Superstructure | |
03RA | IM 0293(106)76 | 8730 | 12/15/2021 | 35568714.000 | Grading, Structures (242' Steel Girder Bridge Widening), MSE Retaining Walls, Curb & Gutter, Storm Sewer, PCC Pavement, Sidew | |
03RD | IM 2292(95)0 | 9046 | 8/16/2023 | 2496494.400 | Median Lighting & Innerduct Installation | |
03TH | NH 0018(184)39 | 8622 | 11/3/2021 | 22618378.600 | Urban Reconstruction, PCC Surfacing, Curb & Gutter, Sidewalk, Lighting, Signals | |
03TK | NH 0018(191)250 | 8617 | 9/1/2021 | 20993728.920 | Grading, PCC Surfacing, Curb & Gutter, Sidewalk, ADA, Storm Sewer, Lighting | |
03V2 | PH 8051(14) | 9571 | 3/19/2025 | 0.000 | Signing & Delineation | |
03V6 | PH 000S(308) | 4591 | 12/25/2099 | 0.000 | Curve Delineation | |
03V7 | PH 000S(309) | 4930 | 12/25/2099 | 0.000 | Curve Delineation | |
03VD | NH-PH 0385(50)96 | 9368 | 10/2/2024 | 49081403.600 | Grading, Interim Surfacing, Replace Str (2-13x13 CIP & 12x12 CIP RCBC) | |
03WA | EM 8014(33) | 4704 | 12/25/2099 | 237040.000 | Shared Use Path | |
03WN | NH-EM 0014(194)227 | 8232 | 9/16/2020 | 49990247.460 | Relace Structure (1686' Steel Girder), Grading, PCC Pavement, Storm Sewer, Sanitary Sewer, Lighting, Signals, Plaza Park & Re | |
03WY | P SRTS(26) | 6224 | 9/30/2017 | 0.000 | Safe Route To School .Traffic Signs, Flashing Beacons, Cross-walks, and Non-infrastructure Projects. PE | |
03X4 | P SRTS(32) | 5008 | 12/25/2099 | 137724.000 | Safe Routes to School | |
041J | P 0022(43) | 4769 | 12/25/2099 | 0.000 | Culvert Repair | |
047U | P 0473(10)91 | 4903 | 12/25/2099 | 0.000 | Asphalt Surface Treatment (Chip Seal) | |
048E | P 0025(78)182 | 4941 | 12/25/2099 | 0.000 | Rout & Seal | |
048Q | P 0020(134)372 | 4945 | 12/25/2099 | 0.000 | Rout & Seal | |
04C2 | P 0ENH(221) | 4698 | 12/25/2099 | 161375.000 | Shared Use Path | |
04DP | IM-B 0908(92)357 | 9124 | 1/17/2024 | 6780595.250 | Deck Replacement, Approach Slab Replacement, Rehab Abutments, Zone Painting | |
04EM | P 0044(211)200 | 9100 | 5/3/2023 | 6024879.000 | Mill, Asphalt Concrete Resurfacing, Pipe Work | |
04EW | P-PH-PT 0025(81)158 | 9436 | 2/19/2025 | 10737861.820 | Grading & Interim Surfacing | |
04F6 | P 0042(77)301 | 9435 | 4/4/2024 | 10389694.550 | Cold Milling, Asphalt Concrete Resurfacing, Pipe Work | |
04FC | NH-CR-EM 0018(195)103 | 9547 | 12/4/2024 | 19308612.990 | Urban Grading, Curb & Gutter, Storm Sewer, Lighting, PCC Surfacing, ADA, Signal | |
04FL | NH-PS 0012(187)106 | 8339 | 12/1/2021 | 13899350.160 | Replace Structures (237' Prestressed Girder, 198' Prestressed Girder, Precast or CIP RCBC's & MSE Wire Wall) & Approach Gradi | |
04FT | P-B 0244(11)27 | 8797 | 10/21/2022 | 5374570.000 | Replace Structure (98' Steel Girder) & Approach Grading, Turn Lanes, Spot Grading | |
04FW | NH 0014(230)145 | 8862 | 9/6/2023 | 16707398.870 | Replace Structure (4-12x12 CIP, 2-12x12 CIP or Precast, 207' Prestressed Girder) & Approach Grading | |
04G5 | NH-B 0081(103)6 | 9193 | 10/4/2023 | 16655788.000 | Grading, Replace Structures (2-109' Prestressed Girder Bridges, 9x8 Precast RCBC) & Interim Surfacing | |
04GG | PH 0030(00) | 4538 | 12/25/2099 | 0.000 | Intersection Signing & Rumble Strips | |
04GK | PH 0020(137) | 4562 | 12/25/2099 | 613825.000 | Corridor Signing | |
04GL | PH 0030(16) | 4551 | 12/25/2099 | 0.000 | Corridor Signing | |
04HL | P-PH 0015(76)128 | 9338 | 2/27/2024 | 11544336.960 | Grading, Structure (9x9 CIP or Precast RCBC) & Interim Surfacing | |
04HM | P-PH 0028(36)355 | 9508 | 2/12/2025 | 10390426.170 | Grading, Interim Surfacing, Replace Structure's (2-9x8 CIP or Precast RCBC, 2-10x9 CIP RCBC), Approach Slab | |
04HP | PH 8016(10) | 9099 | 5/3/2023 | 1687264.700 | Signing & Delineation - Gravel Roads ONLY | |
04HQ | PH 8004(02) | 8064 | 10/16/2024 | 683627.200 | Signing & Delineation | |
04JF | P-PH 0046(61)366 | 9130 | 10/18/2023 | 24893720.550 | Grading, Interim Surfacing, Replace Str (8'x8' CIP or Precast, 3-13'x13' CIP or Precast, 2-12'x12' CIP or Precast, 3-12'x12' | |
04JH | PH 8048(04) | 9655 | 3/5/2025 | 487812.200 | Signing & Delineation | |
04K0 | PH 0044(184)330 | 8332 | 10/7/2020 | 14815979.580 | Shoulder Widening, Asphalt Concrete Surfacing of Shoulders, Pipe Work, Extend RCBC & Upgrade Bridge Approach Rail | |
04K9 | PH 8034(31) | 9062 | 4/19/2023 | 1729632.100 | Signing & Delineation | |
04KD | PH 8062(07) | 9105 | 7/19/2023 | 1488162.200 | Signing & Delineation | |
04KR | P-PH 0034(170)350 | 8860 | 9/21/2022 | 8843105.000 | Shoulder Widening, Replace Stucture (4-12x6 CIP or Precast and 4-12x6 CIP), Asphalt Concrete Surfacing of Shoulders, Pipe Wor | |
04KU | P-PH 0025(76)132 | 9109 | 2/21/2024 | 6968265.550 | Grading & Interim Surfacing | |
04L0 | NH-P-PH 0079(87)129 | 9472 | 12/4/2024 | 6662885.470 | Grading, Asphalt Concrete Surfacing & Resurfacing | |
04L7 | PH 8041(19) | 9310 | 12/13/2023 | 1018476.200 | Signing & Delineation | |
04L9 | PH 8053(23) | 9087 | 6/7/2023 | 1518151.900 | Signing & Delineation | |
04LC | PH 8029(24) | 8753 | 10/5/2022 | 1101762.800 | Signing & Delineation | |
04M4 | P 000S(00)230 | 8634 | 5/19/2021 | 0.000 | County Pavement Marking | |
04NV | P SRTS(37) | 5019 | 12/25/2099 | 75568.000 | Safe Routes to School Project - Dell Rapids | |
04QT | PS 0018(189)374 | 4832 | 12/25/2099 | 0.000 | Railroad Approach Improvement | |
04R8 | P 0032(23)414 | 4923 | 12/25/2099 | 0.000 | Rout and Seal | |
04TF | PH 1400(15) | 4679 | 12/25/2099 | 0.000 | Traffic Adaptive Signal System | |
04U8 | P TAPU(07) | 5048 | 12/25/2099 | 246091.000 | Shared Use Path | |
04V9 | NH 0018(203)333 | 8366 | 11/17/2021 | 5297447.550 | Replace Structure (225' Prestressed Girder Bridge), Approach Grading; Spot Grading, Pipe Work, Interim Surfacing; Intersectio | |
04VC | P 0011(94)86 | 9094 | 9/20/2023 | 329656.880 | Epoxy Chip Seal, Column Repair | |
04VD | P-B 0013(38)108 | 9305 | 12/13/2023 | 924515.100 | LSDC Overlay, Joints, Modify Girder, Bearing Repair, Zone Painting | |
04X0 | P 0044(212)172 | 9316 | 11/15/2023 | 21444089.860 | Full Depth Reclamation, Asphalt Concrete Surfacing, Gravel Surfacing, Modify Intersection, Pipe Work (Pipe Replacements and 3 | |
04X4 | P-PH-EM 0046(60)347 | 8766 | 2/16/2022 | 19329354.590 | Grading, Interim Surfacing, Replace Structure RCBC(2-10x10 CIP, 9x8 CIP, (2) 3-12x12 Precast or CIP, 8x8 CIP & 9x5 Precast or | |
04XC | P-PH-B 0025(85)115 | 8833 | 11/16/2022 | 18297489.130 | | |
04XG | NH-B 0212(184)143 | 8695 | 9/7/2022 | 8391242.650 | Replace Structure (119' Prestressed Girder), Approach Grading, & Asphalt Resurfacing | |
04XK | IM 2292(98)9 | 8962 | 12/7/2022 | 34295545.450 | | |
04XU | NH 0034(176)123 | 8947 | 8/17/2022 | 1995279.650 | Bank Stabilization, Erosion Control & RipRap | |
04XW | P 1806(16)138 | 8857 | 9/7/2022 | 9135064.500 | Spot Grading, Cold Milling, Asphalt Concrete Resurfacing, Pipe Work; Approach Guardrail, Erosion Repair | |
052A | PH 0013(31)127 | 4844 | 12/25/2099 | 54953.000 | Aberdeen Guardrail Contract 1 | |
052E | PH 0013(32) | 4845 | 12/25/2099 | 338714.000 | Aberdeen Guardrail 2 | |
056A | NH-P 0043(17) | 6296 | 4/5/2017 | 0.000 | Asphalt Concrete Crack Sealing | |
05DV | NH 0281(115)194 | 9171 | 9/6/2023 | 2314312.300 | Repair Embankment Settlement, Approach Pavement, Approach Slabs, Zone Painting | |
05DW | P 0020(169)326 | 8816 | 3/1/2023 | 623104.000 | Repair Embankment Settlement, Approach Pavement, Approach Slabs | |
05E9 | NH 0014(234)167 | 9342 | 12/6/2023 | 10933952.940 | Cold Milling, Asphalt Concrete Resurfacing, Shoulder Full Depth Reclamation, Pipe Work, Bridge Rail Upgrade
| |
05EF | IM 0905(109)226 | 8561 | 9/15/2021 | 21484456.190 | Cold Milling, Asphalt Concrete Resurfacing, Pipe Work, Polymer Chip Seal, LSDC Overlay, Approach Slabs | |
05EN | NH 0212(182)187 | 8760 | 12/15/2021 | 11563478.430 | Cold Milling, Asphalt Concrete Resurfacing, Pipe Work & Landslide Repair | |
05ET | P-PH 0052(08)332 | 9040 | 2/15/2023 | 15017076.930 | Shoulder Widening, Asphalt Concrete Surfacing, Bridge Maintenance & Permanent Vehicle Classification System | |
05EX | EM-PH-PP 0013(49)121 | 9467 | 3/5/2025 | 7943270.900 | Shoulder Widening, Cold Milling, Asphalt Concrete Resurfacing, Replace Str (4-12x12 CIP RCBC), Pipe Work
| |
05F4 | P-PH-B-PT 0010(124)296 | 9391 | 4/4/2024 | 22856880.080 | Shoulder Widening, Replace Str RCBC (2-10x4 CIP Box or 2-11x4 Precast Box; 4-12x12 CIP Box; 2-11x4 CIP Box; 10-5 CIP or 11x5 | |
05F9 | IM-PH 0293(107)99 | 8995 | 11/16/2022 | 5560000.000 | High Friction Surface Treatment, Polymer Chip Seal, Deck Repair, Curb Repair, Approach Slabs, Replace Joint | |
05G7 | PH 0010(122) | 9481 | 6/26/2024 | 199667.000 | Durable Pavement Markings | |
05GJ | PH 0020(183) | 9196 | 5/1/2024 | 1395000.000 | Corridor Signing | |
05GY | P-B 0127(07)231 | 8831 | 10/5/2022 | 1422827.750 | Replace Stuctures (3-9' x 6' CIP or Precast RCBC, 2-10' x 6' CIP or Precast RCBC) & Approach Grading | |
05HN | IM-B-CR 2292(101)3 | 9686 | 2/19/2025 | 48026131.120 | Grading, PCC Surfacing, Structures (10x4 RCBC extension, 163' Temporary Bridge, (2) 400' Steel Girder, (2) 12x8 CIP RCBC), Re | |
05HQ | IM-EM 0908(97)362 | 8654 | 12/1/2021 | 37555832.500 | Remove & Replace PCC Pavement, Pipe Work, Structure (254' Steel Girder Bridge, 320' Steel Girder Bridge, 2-6'x5' RCBC Extensi | |
05HT | NH 0012(219)294 | 8858 | 9/7/2022 | 20545094.520 | Grading, PCC Surfacing, Lighting & Structure (12x12 CIP RCBC) | |
05HV | EM 0073(73)62 | 9114 | 10/16/2024 | 25536517.810 | Grading, Interim Surfacing, Replace Str RCBC (2-11'x9' CIP or Precast RCBC) | |
05HW | EM 0012(206)112 | 9039 | 12/13/2023 | 23617916.000 | Grading, Interim Surfacing, Replace Strs (120' Prestressed Girder, 9'x6' CIP or Precast, 6'x6' CIP or Precast, 8'x8' CIP or P | |
05JE | P 1358(05) | 7575 | 1/23/2019 | 23990635.290 | Grading, Storm Sewer, Curb & Gutter, PCC & Asphalt Concrete Surfacing, Signals, Lighting, Permanent Signing, Sidewalk, Retai | |
05JN | NH-CR 0046(69)288 | 9661 | 3/26/2025 | 0.000 | Grading, PCC Surfacing, Storm Sewer, Curb & Gutter, Sidewalk, Lighting, Signals | |
05LY | BRO 8058(00) | 7776 | 3/6/2019 | 540560.950 | Structure (65'-0" Prestressed Double Tee) & Approach Grading | |
05Q6 | P 0015(94)128 | 9569 | 10/16/2024 | 6244318.740 | Asphalt Concrete Surfacing | |
05QC | P 0324(06)357 | 9234 | 10/4/2023 | 2107499.150 | Low Slump Dense Concrete Overlay, Approach Slabs, Joints, Bridge Rail, End Blocks | |
05QE | P 0063(53)144 | 9276 | 10/18/2023 | 2403000.000 | Zone Painting, Replace Joints, Collect Drainage Under Open Joints, Polymer Chip Seal | |
05T2 | IM-EM 0908(97)362 | 9142 | 11/15/2023 | 37296052.100 | Remove & Replace PCC Surfacing, Replace Str (208' Prestressed Girder Bridge, 3-12x12 CIP RCBC), Grading, Pipe Work | |
05T3 | IM-EM 0908(97)362 | 8861 | 10/5/2022 | 35664101.480 | Remove & Replace PCC Surfacing, Replace Str (208' Prestressed Girder Bridge, 3-12x12 CIP RCBC), Grading, Pipe Work | |
05T4 | IM 0906(73)272 | 9332 | 12/13/2023 | 20965228.100 | Asphalt Concrete Milling & Asphalt Concrete Resurfacing | |
05TJ | IM-B 0291(134)44 | 9308 | 1/17/2024 | 6629863.080 | Structure (244' Prestressed Girder Bridge) & Approach Grading | |
05TY | NH 0012(230)171 | 9587 | 11/20/2024 | 24137322.000 | Full Depth Reclamation, Asphalt Concrete Surfacing, Pipe Work | |
05U5 | EM 0012(206)112 | 9438 | 10/2/2024 | 8531809.240 | Cold Milling, Asphalt Concrete Resurfacing & Asphalt Concrete Surfacing | |
05U7 | P-PH-EM 0046(60)347 | 9203 | 9/20/2023 | 9088717.090 | Asphalt Concrete Surfacing | |
05UN | P 0047(113)42 | 9657 | 1/22/2025 | 8730874.100 | Cold Milling, Asphalt Concrete Resurfacing, Pipe Work | |
05UR | P 0038(46)332 | 9409 | 4/4/2024 | 6416810.610 | Cold Milling, Asphalt Concrete Resurfacing, Structure (8x8 CIP RCBC), Pipe Work | |
05UY | NH-TA 0037(157)75 | 9311 | 11/8/2023 | 28686097.390 | Urban Grading, Curb & Gutter, ADA, Signals, Storm Sewer, Lighting, PCC Surfacing, Structure (115' Prestressed Girder Bridge, | |
05V1 | NH 0012(221)278 | 9406 | 4/17/2024 | 10418223.640 | Replace Structure (189' Prestressed Girder, 262' Steel Girder), Approach Grading | |
05VL | PH 0010(143) | 9649 | 10/2/2024 | 1620597.650 | Durable Pavement Marking | |
05VM | PH 0020(184) | 9576 | 7/17/2024 | 1015162.550 | Durable Pavement Marking | |
05VP | PH 0030(37) | 9465 | 4/17/2024 | 80097.200 | Durable Pavement Marking | |
05W2 | PH 0020(188) | 7403 | 12/13/2017 | 490031.400 | Rumble Stripes and Pavement Markings | |
05W7 | IM 0901(194)28 | 8865 | 8/10/2023 | 0.000 | Variable Speed Limit & ITS Device | |
05WM | PH 8028(19) | 9309 | 4/4/2024 | 1409103.900 | Signing & Delineation | |
05WT | PH 8045(02) | 9705 | 4/2/2025 | 0.000 | Signing & Delineation | |
05X3 | PH 0040(314) | 6292 | 1/18/2017 | 330229.650 | Centerline Rumble Stripes | |
05XC | P 0047(118)203 | 9147 | 9/20/2023 | 6545956.890 | Asphalt Concrete Surfacing | |
05YR | IM 0041(159) | 6407 | 4/19/2017 | 0.000 | Asphalt Concrete Crack Sealing | |
0609 | NH-CR 0034(193)402 | 9632 | 11/20/2024 | 10318789.150 | Grading, PCC Surfacing, Curb & Gutter, Sidewalk, Lighting | |
064X | P 0025(88)115 | 9183 | 10/4/2023 | 8994930.680 | Asphalt Concrete Surfacing | |
065E | IM 0293(113)78 | 9554 | 9/4/2024 | 7419860.480 | LSDC Overlay, Approach Slabs, Approach Pavement, Approach Guardrail, Steel Piling Repair | |
065K | IM-B-TA 1902(67)0 | 9076 | 9/20/2023 | 10579709.970 | Replace Str (172' Steel Girder), Approach Grading, PCC Surfacing, Concrete Barrier, Approach Slabs, Guardrail, Lighting & 200 | |
065L | IM 0291(131)0 | 9247 | 8/16/2023 | 4524999.200 | Polymer Chip Seal, Replace Abutments, Berm Repair, Replace Joints, Approach Slabs, Approach Pavement, Approach Guardrail, End | |
0687 | NH 0018(214)286 | 8709 | 11/3/2021 | 7185028.920 | Cold Milling, Asphalt Concrete Resurfacing, Pipe Work | |
068D | NH 0012(226)190 | 8557 | 12/15/2021 | 12183805.720 | Cold Milling Asphalt Concrete, Asphalt Concrete Resurfacing & Pipe work | |
068J | NH 0212(191)134 | 9315 | 11/1/2023 | 16281392.320 | Cold Milling, Asphalt Concrete Resurfacing, Modify Intersection, Lighting | |
0694 | NH-PH 0385(50)96 | 9468 | 10/16/2024 | 3996319.000 | Asphalt Concrete Surfacing | |
069Q | P 0047(117)67 | 9653 | 1/22/2025 | 9262523.630 | Cold Milling, Asphalt Concrete Resurfacing, Approach Guardrail, Pipe Work, Landslide Repair, Rumble Strips | |
069V | P 0053(09)10 | 8842 | 5/4/2022 | 4988094.370 | Cold Milling, Asphalt Concrete Resurfacing, Erosion Repair, Pipework, Guardrail Replacement, & Contractor Furnished and Place | |
06A2 | NH-CR 0037(158)126 | 9380 | 3/20/2024 | 14210000.000 | Urban Grading, PCC Surfacing, Storm Sewer, Curb & Gutter, Sidewalk, Lighting, Signals, Crossing Surface | |
06C7 | NH-PH 0012(229)264 | 8660 | 10/20/2021 | 13177735.500 | Modify Intersections, Passing Lanes, Lighting, Approach Slab, Approach Pavement, Guardrail | |
06CF | IM 2292(103)2 | 9064 | 2/15/2023 | 2603333.330 | Ramp Improvement, LSDC Overlay, Approach Slabs, Approach Pavement, Replace Steel Pedestrian Rail | |
06CM | NH 0212(189)155 | 9660 | 1/22/2025 | 15438011.690 | Cold Milling, Asphalt Concrete Resurfacing, Modify Intersection, Pipe Work, Rumble Stripes & High Grade Polymer Pavement Mark | |
06CV | P 0025(86)55 | 8795 | 3/2/2022 | 1643900.950 | Cold Milling, Asphalt Concrete Resurfacing, Pipe Work | |
06CW | P 0021(174)127 | 9202 | 3/20/2024 | 2876960.450 | Full Depth Reclamation, Asphalt Concrete Surfacing, Pipe Work | |
06DL | IM 0291(132)27 | 9051 | 2/15/2023 | 18238025.800 | Asphalt Concrete Resurfacing, PCC Pavement Repair, Box Culvert Extension (2-10x6 RCBC), Pipe Work | |
06EC | NH-P 0010(172) | 8607 | 6/2/2021 | 734959.180 | Culvert Cleaning & Cured In Place Culvert Lining | |
06EG | NH-P 0011(224) | 9555 | 9/18/2024 | 1205644.850 | Culvert Cleaning, CIPP Lining & Pipe Repair | |
06EQ | IM-NH-P 0022(71) | 9254 | 7/17/2024 | 258445.700 | Pipe Work, Culvert & Ditch Cleanout | |
06FD | IM-P 0033(32) | 9484 | 9/4/2024 | 336247.200 | Pipe Work | |
06FR | P 0011(141) | 9085 | 3/1/2023 | 1871643.000 | Approach Slab Repair, Polymer Chip Seal & Berm Repair | |
06FT | IM-NH-P 0012(276) | 9098 | 4/19/2023 | 9531298.730 | Approach Slab Repair, Replace Joint, Polymer Chip Seal, PCC Pavement Grinding, Joint & Spall Repair | |
06FU | IM-P 0020(182) | 9452 | 6/5/2024 | 6309758.150 | Shoulder Strengthening, PCC Approach Pavement, Approach Slabs, Approach Guardrail & EndBlocks, Polymer Chip Seal, Scour Prote | |
06FV | IM 0020(186) | 9182 | 9/20/2023 | 4204503.000 | Shoulder Strengthening, Berm Repair, Bridge Deck Polymer Chip Seal, Approach Slabs & Approach Pavement | |
06FX | NH 0300(31) | 9004 | 4/5/2023 | 1123522.920 | Approach Slab Repair & Polymer Chip Seal | |
06G1 | P 0079(88)133 | 9580 | 12/4/2024 | 1442898.630 | ADA & Sidewalk | |
06G8 | IM 0909(92)387 | 9561 | 3/12/2025 | 12614040.210 | Interchange Reconstruction, Structure (258' Steel Girder Bridge), PCC Surfacing, Sidewalk | |
06J6 | NH 0081(110)61 | 8804 | 4/6/2022 | 3276735.130 | Cold Milling Asphalt Concrete, Asphalt Concrete Resurfacing, Pipe Work | |
06JF | PH 0020(201) | 9020 | 3/1/2023 | 5486277.000 | Grading, Culvert Extensions, Asphalt Concrete Surfacing | |
06K4 | PH 0020(199) | 9035 | 11/16/2022 | 3684259.810 | Modify Intersection, Grading, Culvert Extensions & Asphalt Concrete Surfacing | |
06K5 | PH 0010(152) | 9077 | 3/22/2023 | 6734394.380 | Grading, Culvert Extensions, PCC Surfacing, Asphalt Concrete Surfacing | |
06K6 | PH 0385(58)61 | 8845 | 11/2/2022 | 0.000 | Modify Intersection | |
06K7 | NH 0014(237)245 | 8854 | 11/16/2022 | 8671380.740 | Modify Intersection, PCC Surfacing | |
06L0 | P 0065(19)164 | 8722 | 5/4/2022 | 1797814.280 | Pipe Work, Erosion Control | |
06N7 | P TAPU(22) | 8233 | 2/1/2023 | 392315.700 | Shared Use Path | |
06P3 | IM 0295(46)139 | 9579 | 11/6/2024 | 9840426.330 | Cold Milling, Asphalt Concrete Surfacing/Resurfacing, Guardrail, Pipe Work, Ramp Detours, Acceleration and Deceleration Lane | |
06P9 | NH 0081(112)95 | 9551 | 7/17/2024 | 12127904.810 | Cold Milling, Full Depth Reclamation, Asphalt Concrete Surfacing, Pipe Work, Modify Intersection | |
06PE | NH 0281(125)35 | 9746 | 4/16/2025 | 0.000 | Cold Milling, Asphalt Concrete Resurfacing, Pipe Work & Pavement Markings | |
06PF | NH 0212(209)346 | 9410 | 3/6/2024 | 10983007.000 | Cold Milling, Asphalt Concrete Resurfacing, Pipe Work & Permanent Vehicle Classification System | |
06PN | NH 0037(164)24 | 9414 | 3/20/2024 | 4540728.490 | Cold Milling, Asphalt Concrete Resurfacing, Pipe Work | |
06PV | NH 0012(281)233 | 9201 | 11/1/2023 | 5386859.210 | Cold Milling, Asphalt Concrete Resurfacing, Pipe Work (End Sections) | |
06Q8 | P 0047(122)58 | 9499 | 1/22/2025 | 3226497.540 | Cold Milling, Asphalt Concrete Resurfacing, Pipe Work | |
06QK | P-PT 016A(15)26 | 9119 | 2/5/2025 | 15566575.480 | Structure's (2-12'x12' CIP RCBC, 2-9'x7'CIP RCBC, 2-8'x7' CIP RCBC) & Approach Grading, Cold Milling, Asphalt Concrete Resurfacing, Pipe Work, Modify Intersection, Bridge Rail Upgrade, Inslope Restoration | |
06QP | P 1806(23)186 | 9346 | 2/5/2025 | 11552492.070 | Cold Milling, Asphalt Concrete Resurfacing, Shoulder Shaping, Pipe Work, Modify Intersection | |
06R0 | P 0034(206)245 | 9366 | 4/17/2024 | 5571584.700 | Cold Milling, Asphalt Concrete Resurfacing, Full Depth Reclamation | |
06R3 | P 0044(217)88 | 9021 | 11/16/2022 | 12808955.500 | Spot Grading, Asphalt Concrete Resurfacing, Contractor Furnished Asphalt Concrete | |
06R6 | P-PT 0020(208)296 | 9373 | 2/7/2024 | 13331787.480 | Cold Milling, Asphalt Concrete Resurfacing, Structure (7x6 CIP RCBC) & Pipe Work | |
06RN | P 0026(06)253 | 9207 | 11/15/2023 | 3891160.740 | Cold Milling, Asphalt Concrete Resurfacing, Pipe Work (End Sections & Pipe Replacement) | |
06RR | P 0079(90)203 | 9588 | 11/20/2024 | 5133364.770 | Cold Milling, Asphalt Concrete Resurfacing, Pipe Work | |
06T0 | P 0034(208)212 | 9449 | 4/17/2024 | 2118589.760 | Cold Milling, Asphalt Concrete Resurfacing | |
06TD | P 0079(84)232 | 9639 | 12/11/2024 | 10358866.000 | Structure (196' Prestressed Girder Bridge) & Approach Grading | |
06U2 | PH 000S(403) | 9491 | 6/5/2024 | 669669.000 | High Friction Surface Treatment | |
06UA | PH 0020(211) | 9711 | 3/5/2025 | 210073.750 | Rumble Stripes | |
06UC | PH 0010(166) | 9718 | 3/19/2025 | 0.000 | Rumble Stripes and High Grade Polymer Pavement Markings | |
06UR | NH-P 0041(169) | 9262 | 2/7/2024 | 4075868.690 | Pipe Replacement, CIPP Lining and Pipe Joint Repair | |
06WY | P 0025(90)132 | 9464 | 11/6/2024 | 3747159.920 | Asphalt Concrete Surfacing | |
06X7 | PT 0014(238)203 | 9549 | 12/4/2024 | 1064477.750 | Slide Repair, Erosion Control, Pipe Work | |
06XE | NH 0012(273)301 | 9125 | 7/19/2023 | 771553.500 | Inslope Restoration | |
06XN | NH 0034(201)73 | 9426 | 10/2/2024 | 1738860.360 | Structure (4-12x10 CIP or Precast RCBC) & Approach Grading | |
06YQ | NH 2042(29) | 8522 | 4/6/2022 | 20025525.250 | Grading, Storm Sewer, Curb & Gutter, PCC Surfacing, ROW, Signals & Lighting | |
0745 | P TAPU(25) | 9318 | 3/20/2024 | 830268.200 | Asphalt Concrete Shared Use Path & 8x8 CIP RCBC Extension | |
0749 | P TAPR(31) | 8534 | 2/7/2024 | 679971.000 | Shared Use Path | |
074F | NH 0083(88)40 | 8802 | 1/22/2025 | 633482.430 | Replace Pipe & Drainage Improvements | |
079E | NH 0014(242)363 | 9662 | 2/5/2025 | 16118821.110 | Rubblize PCC Pavement, Asphalt Concrete Surfacing, Pipe Work, Approach Slabs, Polymer Chip Seal, Weigh-in Motion, Modify Intersection | |
07A2 | PH 0020(212) | 9402 | 3/20/2024 | 168388.590 | Intersection Safety Improvements, Signing & Lighting | |
07CL | P 00SW(00)5 | 9289 | 5/23/2023 | 167790.300 | Wetland Bank Site Management | |
07CM | P 00SW(00)5 | 9304 | 5/23/2023 | 167815.900 | Wetland Bank Site Management | |
07CV | IM 0020(205) | 9448 | 4/4/2024 | 1911334.400 | Approach Slab Repair, Polymer Chip Seal, Crash Wall | |
07CY | IM 2292(105)3 | 9375 | 5/15/2024 | 5659099.000 | Temporary Grading, Asphalt Concrete Surfacing, Temporary Structure Installation & Large Block Concrete Retaining Walls, Cross | |
07D3 | IM 0901(200)1 | 9413 | 8/21/2024 | 3188644.810 | Polymer Chip Seal, Joints, Approach Slab Repair | |
07D4 | IM 0296(33)168 | 9459 | 5/1/2024 | 317567.120 | Prestressed Girder Repair & Concrete Metalizing | |
07D5 | IM 0292(89)50 | 9396 | 2/7/2024 | 2407590.700 | LSDC, Polymer Chip Seal, Bearing Repair, Joints, Approach Slabs | |
07D8 | IM-NH-P 0012(290) | 9385 | 4/17/2024 | 2637763.200 | Bridge Deck Polymer Chip Seal, Approach Slabs, Bridge Rail | |
07DH | NH 0081(114)0 | 9359 | 3/5/2025 | 3875750.740 | ADA, Modify Intersection,Signals | |
07K2 | P 000S(00)326 | 8127 | 11/21/2019 | 0.000 | Proposal to Purchase State Owned Rail Lines | |
07M9 | NH 0018(231)339 | 9701 | 3/19/2025 | 0.000 | Inslope Flattening, Shared Use Path, Pedestrian Bridge, Lighting | |
07NV | NH 0018(229)285 | 8940 | 10/5/2022 | 348825.460 | Roadway Lighting | |
07RF | P TAPU(27) | 8841 | 11/2/2022 | 633269.800 | PCC Shared Use Path & Asphalt Concrete Surfacing | |
07V2 | NH-CR 0081(122)3 | 9658 | 1/22/2025 | 11203098.910 | Asphalt Concrete Surfacing/Resurfacing, PCC Surfacing | |
07V4 | NH 0385(60)35 | 8623 | 11/3/2021 | 3221921.620 | Urban Reconstruction, PCC Surfacing, Lighting, Curb & Gutter, Storm Sewer
| |
07W6 | PT 0908(105)349 | 9645 | 11/6/2024 | 11108700.000 | Spot Grading, PCC Surfacing, Crossover, Structures (8x8 CIP or Precast RCBC, 2-9x4 Precast RCBC, 11x5 Precast RCBC) | |
07WH | P 0015(93)175 | 9112 | 5/17/2023 | 260192.000 | High Friction Bridge Deck Polymer Chip Seal | |
07WN | NH-B 0044(221)42 | 9122 | 8/16/2023 | 269479.400 | Column Repair | |
07X5 | PH 0010(171) | 9642 | 9/18/2024 | 107946.600 | County Pavement Marking | |
07Y2 | NH 0085(112)146 | 9312 | 12/13/2023 | 8478279.350 | Full Depth Reclamation, Cold Milling, Asphalt Concrete Surfacing, Pipe Work (Repair Joints, 24" CIPP, 36" CIPP, Slipline 66") | |
07Y7 | NH 0018(234)387 | 9264 | 10/4/2023 | 5020708.810 | Cold Milling & Asphalt Concrete Surfacing | |
07Y8 | P 0044(222)330 | 9014 | 2/1/2023 | 8082228.440 | Cold Milling & Asphalt Concrete Resurfacing | |
07YW | NH 0081(120)145 | 9434 | 1/22/2025 | 6122052.930 | Cold Milling, Asphalt Concrete Resurfacing & Pipe Work | |
07YX | NH 0212(204)245 | 9570 | 10/16/2024 | 6949645.610 | Cold Milling & Asphalt Concrete Resurfacing | |
0808 | NH 0212(206)313 | 9691 | 3/19/2025 | 0.000 | Grading, Interim Surfacing | |
080C | NH 0281(126)41 | 9206 | 10/4/2023 | 941074.940 | Storm Sewer (860'), Curb & Gutter & Asphalt Composite | |
080D | CR 0294(74)114 | 9650 | 12/11/2024 | 3364747.930 | Variable Speed Limit & ITS Device | |
081A | IM 0901(202)26 | 9683 | 2/5/2025 | 2001943.600 | LSDC Overlay, Approach Slabs, Approach Rail
| |
081K | NH 0083(91)118 | 9437 | 5/1/2024 | 2125392.300 | Polymer Chip Seal, Approach Slabs | |
081T | P-B 0050(136)232 | 9126 | 10/18/2023 | 445607.600 | Column & Bent Repair, Approach Slab Joint Repair | |
081V | P-B 0028(53)375 | 9086 | 4/19/2023 | 82802.730 | Column Repair | |
0823 | PT 0011(153)57 | 9389 | 4/4/2024 | 285987.800 | Scour Protection, Berm Repair | |
0824 | PT 0042(90)305 | 9390 | 1/17/2024 | 319403.000 | | |
082C | PT 0011(158)12 | 9723 | 4/2/2025 | 0.000 | Scour Protection, Berm Repair | |
0847 | BRO-B 8003(34) | 9250 | 10/4/2023 | 1298816.200 | Structure (3-12x5 CIP RCBC, 2-14x5 CIP RCBC, 2-12x5 CIP RCBC) & Approach Grading | |
084D | BRO-B 8026(34) | 9296 | 6/26/2024 | 4310821.310 | Structure (228' composite Steel Plate Girder Bridge) & Approach Grading | |
084E | BRO-B 8005(14) | 9209 | 9/6/2023 | 1990887.800 | Structure (2-10x9 CIP RCBC, 3-10x10 CIP RCBC, 3-11x6 CIP RCBC) & Approach Grading | |
084G | BRO-B 8006(55) | 9253 | 2/7/2024 | 525258.300 | Structure (3-14x7 CIP RCBC) & Approach Grading | |
084J | BRO-B 8007(212) | 9252 | 11/20/2024 | 0.000 | Structure (122' Continuous Concrete) & Approach Grading | |
084K | BRF-B 6237(07) | 9012 | 1/11/2023 | 7273342.990 | Structure (134' Continuous Concrete Bridge, 3-12'x8' CIP RCBC, 4-12'x12' CIP RCBC, 4-14'x13' CIP RCBC) & Approach Grading | |
084L | BRF-B 6410(10) | 9013 | 1/11/2023 | 844589.500 | Structure (2-10x10 Precast RCBC & 2-8'x7' Precast RCBC) & Approach Grading | |
084R | BRO-B 8049(22) | 9275 | 1/17/2024 | 1484471.840 | | |
084T | BRF-B 6516(05) | 8901 | 11/16/2022 | 1616696.000 | Structure (5-12'x10' CIP RCBC) & Approach Grading | |
084U | BRO-B 8026(35) | 9297 | 12/13/2023 | 1864636.200 | Structure (3-12x11 CIP RCBC; 4-11x11 CIP RCBC) & Approach Grading | |
0851 | BRO-B 8034(34) | 9326 | 6/5/2024 | 2009054.000 | Structure (102' Continuous Concrete Bridge) & Approach Grading | |
085A | BRO-B 8042(46) | 9107 | 11/1/2023 | 1290519.060 | Structure's (3-12x6 CIP RCB, 2-9x7 CIP RCBC) & Approach Grading | |
085C | BRO-B 8042(47) | 9194 | 12/6/2023 | 2152379.920 | Structure (162' Continuous Concrete Bridge) & Approach Grading | |
085K | BRO-B 8050(82) | 9108 | 2/21/2024 | 774385.000 | Structure (3-12'x7' CIP RCBC, 3-10'x7 CIP or Precast RCBC) & Approach Grading | |
085Q | BRO-B 8051(16) | 9274 | 9/4/2024 | 1396252.200 | Structure (162' Continuous Concrete) & Approach Grading | |
085T | BRO-B 8052(73) | 9292 | 2/7/2024 | 3230730.200 | | |
0862 | BRO-B 8052(75) | 9294 | 6/26/2024 | 831794.980 | Structure (2-15'x3.5' CIP RCBC) & Approach Grading
| |
086A | BRO-B 8058(23) | 9251 | 10/18/2023 | 2745000.000 | Structure (4-10'x9' CIP RCBC, 4-10'x8' CIP RCBC, 3-12'x11' CIP RCBC) & Approach Grading | |
086C | BRF-B 6173(07) | 9249 | 11/15/2023 | 2131500.000 | Structure (4-11'x10' CIP RCBC, 4-14'x14' CIP RCBC) & Approach Grading | |
086G | BRO-B 8058(27) | 9298 | 9/4/2024 | 5036790.750 | Structure (155' Prestressed Girder & 166' Prestressed Girder) & Approach Grading | |
086K | BRO-B 8058(29) | 9299 | 1/17/2024 | 5588076.000 | | |
086R | BRF-B 6139(12) | 9293 | 12/13/2023 | 3003469.900 | Structure (81.5' Continuous Concrete Bridge & 3-12'x12' CIP RCBC) & Approach Grading | |
08CU | P 6353(00) | 9651 | 3/12/2025 | 3173470.690 | Urban Grading, PCC Surfacing, Curb & Gutter, Storm Sewer, Shared Use Path, Sidewalk, Lighting | |
08CW | NH-PT 0046(83)287 | 9358 | 2/7/2024 | 5109919.070 | Grading, Asphalt Concrete Surfacing, RCBC (12'x12' CIP) | |
08DP | IM 0909(94)383 | 9757 | 4/16/2025 | 0.000 | Deck Replacement, Approach Slabs, Rehab Abutments, Bridge Painting, Fatigue Retrofit | |
08E7 | P TAPU(31) | 8815 | 12/13/2023 | 955809.450 | Asphalt Concrete Shared Use Path | |
08FA | BRF 6545(00)21-2 | 8859 | 5/17/2023 | 3218843.010 | Structure (174' Continuous Concrete) & Approach Grading | |
08H1 | PS 0014(247)227 | 9756 | 4/2/2025 | 0.000 | Traffic Detour, Pavement Marking, Asphalt Surfacing at Rail Road Crossing | |
08H9 | NH 0018(239)244 | 9736 | 4/16/2025 | 0.000 | LSDC Overlay | |
08HV | NH 0014(249)415 | 9700 | 2/5/2025 | 322604.100 | Polymer Chip Seal | |
08JN | NH 0281(128)193 | 9699 | 2/19/2025 | 499499.000 | Polymer Chip Seal | |
08KR | NH-P 000S(432) | 9330 | 3/20/2024 | 2584969.530 | Inslope Repair & Restoration, Culvert Extensions | |
08LF | NH 0034(00)387 | 9428 | 4/17/2024 | 37591.830 | Rectangular Rapid Flashing Beacon Installation | |
08M0 | NH 0037(170)120 | 9698 | 2/5/2025 | 3010000.000 | Low Slump Dense Concrete Bridge Overlay, Berm Repair, Approach Slabs, Approach Pavement, Approach Guardrail | |
08M8 | NH 0012(298)106 | 9345 | 6/5/2024 | 3208409.900 | Cold Milling Asphalt Concrete, Asphalt Concrete Surfacing (17k Tons) & Pipe Work | |
08MF | BRO-B 8003(38) | 9095 | 11/20/2024 | 716841.900 | Structure (3-12'x8' CIP RCBC) & Approach Grading | |
08MG | BRO-B 8003(39) | 9432 | 3/5/2025 | 745064.650 | Structure (5-12x8 CIP RCBC) & Approach Grading | |
08MH | BRO-B 8005(16) | 9173 | 10/16/2024 | 443029.150 | Structure (3-84" RCP) & Approach Grading | |
08MJ | BRO-B 8006(56) | 9127 | 2/7/2024 | 1032842.230 | Structure (3-11'x9' CIP RCBC) & Approach Grading | |
08ML | BRO-B 8010(29) | 9374 | 11/6/2024 | 1668709.500 | Structure (127' Continuous Concrete Bridge) & Approach Grading | |
08MM | BRF-B 6510(05) | 9341 | 11/6/2024 | 2417063.000 | Structure (125'-7" Continuous Concrete Bridge) & Approach Grading | |
08MP | BRO-B 8026(36) | 9011 | 4/5/2023 | 262023.000 | Structure (2-12x6 Precast RCBC) & Approach Grading | |
08MR | BRO-B 8030(18) | 9073 | 11/20/2024 | 568269.140 | Structure (3-10'x8' CIP RCBC) & Approach Grading | |
08MT | BRO-B 8030(19) | 9090 | 12/4/2024 | 382043.500 | Structure (3-12'x6' Precast RCBC) & Approach Grading | |
08MU | BRO-B 8030(20) | 9059 | 11/20/2024 | 496829.930 | Structure (2-9'x9' CIP RCBC) & Approach Grading | |
08MX | BRO-B 8034(35) | 9210 | 12/4/2024 | 361002.750 | Structure (3-12'x5' Precast RCBC) & Approach Grading | |
08MY | BRF-B 6236(06) | 8803 | 10/4/2023 | 987560.000 | Structure (4-14x12 Precast RCBC) & Approach Grading | |
08N2 | BRO-B 8052(76) | 9340 | 1/22/2025 | 1085672.700 | Structure (50' Concrete Rigid Frame) & Approach Grading | |
08N3 | BRO-B 8052(77) | 9261 | 10/16/2024 | 968268.450 | Structure (80' Prestressed Girder Bridge) & Approach Grading | |
08N4 | BRO-B 8055(34) | 9146 | 5/15/2024 | 477932.000 | Structure (2-10'x6' CIP RCBC) & Approach Grading | |
08N5 | BRO-B 8055(35) | 9145 | 5/15/2024 | 839168.500 | Structure (3-12'x8' CIP RCBC) & Approach Grading | |
08N6 | BRO-B 8065(20) | 9128 | 1/22/2025 | 471032.000 | Structure (2-12'x6' CIP RCBC) & Approach Grading | |
08N8 | BRO-B 8058(31) | 9131 | 11/6/2024 | 1229188.530 | Structure (5-12'x12' CIP RCBC) & Approach Grading | |
08N9 | BRO-B 8058(32) | 9160 | 11/6/2024 | 848769.520 | Structure (4-12'x9' CIP RCBC) & Approach Grading | |
08NC | BRO-B 8062(11) | 9433 | 12/11/2024 | 621433.470 | Structure (3-12x9 CIP RCBC) & Approach Grading | |
08ND | BRO-B 8064(31) | 8961 | 10/16/2024 | 674505.000 | Structure (3-9'x9' Precast RCBC) & Approach Grading | |
08NE | BRO-B 8069(04) | 8886 | 2/5/2025 | 787323.920 | Structure (3-11'x10' CIP RCBC) & Approach Grading | |
08NF | BRO 8003(40) | 9019 | 5/3/2023 | 352928.800 | Structure Removal (60' Steel Girder, 27.5' Steel Girder, 27' Steel Girder & 34.5' Concrete)
| |
08NG | BRO 8014(38) | 9170 | 3/5/2025 | 212212.000 | Structure Removal (91' Steel Thru Truss, 152' Steel Thru Truss, 24.5' Steel Girder, 55' Steel Pony Truss) | |
08NQ | BRF 6545(05) | 9154 | 8/21/2024 | 416360.000 | Structure Removal (254' Steel Girder) | |
08NT | BRF-B 6642(03) | 9348 | 12/11/2024 | 589228.420 | Structure (10x6 Precast; 2-8x7 Precast; 3-5' RCP Pipe Culverts), Approach Grading | |
08NW | BRO-B 8047(32) | 9339 | 1/22/2025 | 133510.000 | Structure Removal (51' Steel Beam Bridge) & Pipe Installation | |
08P3 | P 6403(10) | 8369 | 3/22/2023 | 23381920.130 | Grading, Drainage, Base Course, Asphalt Concrete Surfacing | |
08P7 | IM-NH-P 0020(224) | 9407 | 3/6/2024 | 286933.500 | Concrete Penetrating Sealer | |
08P8 | IM-NH-P 0020(225) | 9648 | 11/6/2024 | 246246.460 | Bridge Deck Treatment | |
08PN | IM 0291(136)9 | 9419 | 8/21/2024 | 899338.400 | Replace Joints, Bearings, Box Girder End Repair | |
08QW | NH-P 0021(184) | 9233 | 6/21/2023 | 444533.240 | Asphalt Concrete Crack Sealing | |
08R3 | NH-P 0023(65) | 9469 | 5/1/2024 | 434124.110 | Rout & Seal | |
08R6 | IM-NH-P 0021(183) | 9216 | 6/21/2023 | 7177436.860 | Asphalt Surface Treatment | |
08RM | IM-NH-P 0022(89) | 9485 | 6/5/2024 | 2363913.770 | Grinding, Joint & Spall Repair/Pavement Repair | |
08RN | NH 0033(41) | 9365 | 3/6/2024 | 15068007.000 | Joint & Spall Repair, Joint Seal, Asphalt Concrete Surfacing of Shoulders | |
08W3 | P TAPU(34) | 9319 | 3/20/2024 | 628075.600 | Asphalt Concrete Share Use Path | |
08W6 | P TAPU(37) | 9408 | 5/15/2024 | 293293.000 | PCC Shared Use Path | |
08XP | NH-CR 0012(310)298 | 9235 | 10/18/2023 | 5868951.950 | Cold Milling, Asphalt Concrete Resurfacing of Shoulders & WIM Upgrades | |
08XQ | NH-CR 0012(311)343 | 9678 | 2/19/2025 | 3996658.140 | Cold Milling, Asphalt Concrete Resurfacing of Shoulders | |
08XW | NH-CR 0081(127)119 | 9208 | 10/18/2023 | 9528149.550 | Cold Milling, Asphalt Concrete Resurfacing, Shoulder Surfacing | |
08XY | IM 0291(138)1 | 9314 | 10/18/2023 | 3180471.680 | Cold Milling, Asphalt Concrete Resurfacing of Shoulders, Modify NB Off Ramp, Lighting | |
08Y8 | IM-CR 0022(94) | 9450 | 5/1/2024 | 7790806.150 | Cold Milling, Asphalt Concrete Resurfacing of Shoulders, Asphalt Surface Treatment | |
08YD | NH 0083(92)138 | 9626 | 11/20/2024 | 7691454.680 | Asphalt Concrete Surfacing of Shoulders | |
091E | PH 8007(214) | 9510 | 8/21/2024 | 135438.000 | Guardrail Installation | |
091K | IM 0903(117)131 | 9743 | 4/2/2025 | 0.000 | LSDC Overlay, Joints, Approach Surfacing, Guardrail, Column Repair
| |
091L | IM 0902(186)101 | 9753 | 4/16/2025 | 0.000 | LSDC Overlay, Joints, Approach Slabs, Approach Surfacing, Guardrail, Polymer Chip Seal
| |
091T | IM 0909(98)396 | 9641 | 12/4/2024 | 3124668.840 | LSDC Overlay, Approach Slabs, Pavement, Rails, Joints
| |
092U | PH 1757(02) | 9638 | 4/2/2025 | 0.000 | Grading, Asphalt Concrete Surfacing, Pavement Markings, Permanent Signing | |
0950 | NH 0115(61)76 | 9334 | 3/6/2024 | 281966.200 | Traffic Control Signals | |
095G | PH 0044(238)172 | 9236 | 11/15/2023 | 252551.480 | Intersection Lighting | |
095J | IM-CR 0291(137)12 | 9156 | 6/21/2023 | 1313742.090 | PCC Pavement Repair & Electronic Screening System Modification | |
095Q | IM 2292(113)0 | 9317 | 10/18/2023 | 1318725.000 | Sign Bridges, Guardrail | |
0968 | NH 0042(97) | 9708 | 3/5/2025 | 570085.650 | Rout & Seal | |
096E | IM 0901(209)14 | 9591 | 11/20/2024 | 528791.340 | Interstate Fence | |
096J | NH-P 0032(43) | 9497 | 6/5/2024 | 1079427.800 | Rout & Seal | |
096K | NH-P 0031(58) | 9416 | 4/4/2024 | 223494.240 | Rout & Seal | |
096Q | IM-P 0012(314) | 9401 | 2/7/2024 | 198922.400 | Rout & Seal | |
096T | P 0033(43) | 9412 | 3/20/2024 | 198144.450 | Rout & Seal | |
096V | NH-P 0042(98) | 9403 | 3/6/2024 | 9343320.500 | Asphalt Surface Treatment | |
0970 | NH-P 0013(168) | 9441 | 4/4/2024 | 3557012.330 | Asphalt Surface Treatment | |
0971 | IM-NH-P 0021(186) | 9498 | 6/5/2024 | 7119759.850 | Asphalt Surface Treatment | |
0972 | NH-P 0032(44) | 9442 | 4/17/2024 | 808358.030 | Asphalt Surface Treatment | |
0973 | NH-P 0031(59) | 9415 | 3/20/2024 | 3294106.360 | Asphalt Surface Treatment | |
0975 | IM-P 0022(96) | 9710 | 3/5/2025 | 1630028.200 | Asphalt Surface Treatment | |
0976 | IM-NH-P 0033(44) | 9480 | 5/15/2024 | 3533799.560 | Asphalt Surface Treatment | |
097A | IM-NH-P 0012(315) | 9493 | 5/15/2024 | 6989259.180 | Asphalt Surface Treatment | |
097D | NH-P 0040(355) | 9444 | 4/17/2024 | 3262909.350 | Pavement Restoration | |
097F | IM-NH-P 0023(69) | 9494 | 8/21/2024 | 782386.860 | Pavement Preservation | |
097Q | IM-P-B 0905(00)212 | 9656 | 12/11/2024 | 2741567.560 | Asphalt Concrete Surfacing, CRC Pavement Repair | |
09A3 | BRO-B 8047(33) | 9273 | 2/5/2025 | 33111.000 | Structure Removal (58' Timber Beam Bridge) | |
09AT | P-CR 0063(68)28 | 9284 | 11/15/2023 | 225354.720 | Roadway Lighting | |
09AU | P 0052(09)340 | 9471 | 5/15/2024 | 340506.900 | Traffic Signals & Lighting | |
09C9 | PH 0037(173)30 | 9601 | 9/18/2024 | 204927.800 | Intersection Lighting | |
09E7 | IM-CR 0291(139)4 | 9693 | 2/12/2025 | 9956002.990 | Cold Milling, Asphalt Concrete Resurfacing of Shoulders & Ramps & Crossroads, Durable Pavement Marking & Guardrail | |
09EJ | NH 0012(316)137 | 9679 | 12/11/2024 | 5051702.400 | Asphalt Concrete Surfacing of Shoulders | |
09EX | NH-CR 0385(65)37 | 9589 | 10/2/2024 | 2039781.700 | Cold Milling, Asphalt Concrete Resurfacing of Shoulders | |
09FL | PH 0020(242) | 9550 | 8/21/2024 | 1263282.250 | Centerline Rumble Stripes & Durable Pavement Markings | |
09FU | P 00SW(00)5 | 9290 | 5/23/2023 | 167815.900 | Wetland Bank Site Management | |
09FV | P TAPU(38) | 9466 | 2/19/2025 | 457997.920 | PCC Shared Use Path | |
09FX | P TAPU(40) | 9680 | 3/19/2025 | 0.000 | PCC Shared Use Path | |
09FY | P TAPU(41) | 9320 | 12/13/2023 | 777759.830 | Asphalt Concrete Shared use Path & Retaining Wall | |
09G2 | P TAPR(52) | 9704 | 3/5/2025 | 462807.180 | PCC Shared Use Path | |
09J7 | P 0045(66)30 | 9451 | 5/15/2024 | 289988.500 | Approach Slabs | |
09KE | NH-PH-B 0385(00)87 | 9522 | 6/26/2024 | 540852.400 | Gravel Surfacing | |
09KF | NH 0081(129)131 | 9492 | 6/5/2024 | 343881.270 | Lighting | |
09KJ | NH-P 0011(316) | 9732 | 4/2/2025 | 0.000 | Rout & Seal | |
09KL | NH-P 0013(169) | 9729 | 3/19/2025 | 0.000 | Rout & Seal | |
09KP | NH-P 0031(60) | 9770 | 4/16/2025 | 0.000 | Rout & Seal | |
09KQ | NH-P 0041(183) | 9716 | 3/19/2025 | 0.000 | Rout & Seal | |
09KR | P 0012(318) | 9730 | 3/5/2025 | 67515.050 | Rout & Seal | |
09KV | NH-P 0011(317) | 9728 | 4/16/2025 | 0.000 | Asphalt Surface Treatment | |
09KW | NH-P 0042(99) | 9726 | 4/2/2025 | 0.000 | Asphalt Surface Treatment | |
09KX | NH 0043(38) | 9725 | 3/19/2025 | 0.000 | Asphalt Surface Treatment | |
09KY | P 0013(170) | 9734 | 3/19/2025 | 0.000 | Asphalt Surface Treatment | |
09L0 | NH-P 0021(188) | 9769 | 4/16/2025 | 0.000 | Asphalt Surface Treatment | |
09L1 | NH-P 0032(46) | 9714 | 3/5/2025 | 5281436.100 | Asphalt Surface Treatment | |
09L4 | NH 0041(184) | 9735 | 3/5/2025 | 683245.700 | Asphalt Surface Treatment | |
09L6 | IM-P 0012(319) | 9744 | 4/2/2025 | 0.000 | Asphalt Surface Treatment | |
09L7 | NH-P 0033(46) | 9760 | 4/16/2025 | 0.000 | Asphalt Surface Treatment | |
09L9 | P 0011(318) | 9731 | 3/19/2025 | 0.000 | Crack Leveling | |
09LC | NH 0013(171) | 9754 | 4/2/2025 | 0.000 | PCC Pavement Grinding | |
09LD | IM-NH-P 0022(100) | 9751 | 4/16/2025 | 0.000 | NRC Pavement Repair, Spall Repairs, Sealing Random Cracks, Joint Resealing and Tie Bar Retrofit | |
09LG | P 016A(00)24 | 9420 | 3/20/2024 | 779341.350 | Asphalt Concrete Shared Use Path | |
09NV | IM 0902(188)67 | 9531 | 6/26/2024 | 8139124.000 | Asphalt Concrete Resurfacing | |
09P1 | IM 0907(93)310 | 9668 | 8/19/2024 | 705978.750 | Install Closure Gates, Lighting | |
09PE | CR 0014(262)378 | 9523 | 4/16/2025 | 0.000 | Lighting | |
09PH | IM 0902(00)82 | 9692 | 9/18/2024 | 86860.000 | Remove Service Road, Restore ROW | |
09Q5 | IM 0906(00)292 | 9509 | 6/5/2024 | 686407.360 | Heat Straightening & Girder Repair | |
09Q9 | IM 0902(189)98 | 9586 | 9/18/2024 | 499224.100 | Replace Sewer Lines | |
09QY | NH 0281(134)194 | 9755 | 4/16/2025 | 0.000 | Cold Milling, Asphalt Concrete Resurfacing of Shoulders | |
09TL | NH 0085(120)44 | 9697 | 2/5/2025 | 1495022.380 | Cold Milling, Asphalt Concrete Resurfacing of Shoulders, Rumble Strips | |
09VD | NH 0042(100) | 9724 | 4/2/2025 | 0.000 | Pipe Work (564 feet 18" CIPP; 1272 feet 24" CIPP; 430 Feet 30" CIPP; 176 Feet 36" CIPP; 98 Feet 48" CIPP) | |
09VY | IM-B-CR 2292(101)3 | 9737 | 12/17/2024 | 2178000.000 | Pre-purchase Structural Steel | |
09W8 | P 0012(326) | 9727 | 3/19/2025 | 0.000 | Crack Leveling | |
0A29 | IM 0909(92)387 | 9721 | 12/12/2024 | 1203300.000 | Pre-Purchase Structural Steel | |
0A2D | ER 0018(255)432 | 9720 | 12/6/2024 | 19632.660 | Repair shoulder embankment, excavate down approx 2' and place riprap, bury 6", topsoil, seed and mulch | |
0A2K | ER 0018(257)423 | 9719 | 12/6/2024 | 77931.660 | Repair shoulder embankment due to scour/erosion (approx 2'), repair asphalt shoulder | |
10A1 | 0753-472 | 1945 | 10/5/2005 | 14440.500 | EROSION REPAIR ON SD HWY 75 MRM 221.5 | |
312M | BRO 8042(02) | 2354 | 12/25/2099 | 0.000 | Structure & Approach Grading | |
3967 | BRF 0034( )338 | 4883 | 8/15/2018 | 2162392.000 | Structure and Approach Grading | |
4433 | IM-EM-NH-TA 0909(46)406 | 9306 | 2/27/2024 | 41275125.060 | Interchange Reconstruction, Replace Str Bridge ((2) 222' Steel Girder Bridges, 185' Prestressed Girder Bridge), Lighting, PCC | |
5665 | BRF 0018(00)39 | 3175 | 12/25/2099 | 0.000 | Epoxy Deck Seal & Paint Rail | |
5771 | BRO 8040(08) | 4248 | 12/25/2099 | 0.000 | PE, Structure & Approach Grading | |
6287 | PH 1380(01) | 2221 | 6/15/2006 | 377101.980 | GRADING AND PAVING AT 33RD STREET AND SUMMIT AVENUE | |
6322 | BRO8061(5) | 1177 | | 0.000 | STRUCTURE & APPROACH GRADING IN TODD COUNTY FOR COUNTY STRUCTURE # 61-023-084 | |
6358 | P 6491(06) | 6218 | 9/30/2017 | 0.000 | Grading, Interim Surfacing | |
6540 | PH 000S(142) | 2574 | 12/25/2099 | 0.000 | County Signing | |
6566 | IM 0901(122)12 | 3555 | 5/18/2011 | 3176903.000 | Epoxy Chip Seal, Bridge Rail, Joints, Approach Slabs and Guardrail, & Pavement Restoration | |
6568 | IM 0902(112)59 | 8238 | 11/4/2020 | 17484588.630 | Grading, Curb & Gutter, Storm Sewer, Asphalt
Concrete Surfacing, PCC Sufacing, Structure Widening (222'-6" Steel Girder & 2 | |
6789 | P 6572( ) | 4879 | 6/30/2016 | 1227629.000 | AC Resurfacing | |
6923 | NH 0018(157)438 | 2815 | 5/17/2023 | 45617461.590 | Grading, PCC Surfacing, Asphalt Concrete Surfacing & Replace Str RCBC (2 - 9'x5' Precast or CIP; 2 - 12'x5' CIP RCBC) | |
9999 | 0713-492 | 1267 | 5/14/2003 | 48760.000 | SDDOT ASPHALT PATCHING ON SD 71 FROM MM 9 - 28.7 | |
AAAA | P 0065(21)176 | 9429 | 2/7/2024 | 0.000 | Bridge Deck Polymer Chip Seal | |
B020 | Statewide | 8040 | 5/29/2019 | 1.000 | Precast | |
I1H2 | 4941S | 3176 | 6/11/2009 | 35400.000 | SAND STOCKPILES AT HOT SPRINGS MAINTENANCE YARD | |
I1KK | 000P-492 | 3112 | 6/8/2009 | 30555.000 | CONSTROL GROWTH OF NOXIOUS WEED IN THE SDDOT RIGHT OF WAY | |
I20C | 065-372 | 3962 | 12/25/2099 | 135200.000 | Extra Contract | |
I2F8 | 4 15( ) | 3967 | 10/28/2011 | 22500.000 | DELIVER SALT TO HERMOSA STOCKPILE SITE | |
I3FV | 000N-152 | 4754 | 3/21/2014 | 37647.600 | BROWN COUNTY WEED SPRAY ON PRIORITY AND NON-PRIORITY ROUTES | |
I3X3 | 271-371 | 6075 | 2/25/2016 | 176941.680 | CULVERT REPLACEMENT, COLD MILLING ASPHALT CONCRETE, CONCRETE VALLEY GUTTER AND ASPHALT CONCRETE RESURFACING | |
I3XA | 000I-252 | 5167 | 6/22/2015 | 11900.000 | CONTRACTOR TO PICK UP ROAD KILLED DEER WITHIN THE PROJECT LIMITS OF SECTION 2 | |
I47F | 046-251 | 6066 | 11/3/2015 | 2040.000 | COMPLETE ELECTRICAL WORK TO INSTALL SCHOOL SPEED LIMIT SIGN FLASHING BEACONS | |
I4K9 | 000I-271 | 6403 | 1/18/2017 | 383481.260 | INTERSTATE LOOP MOWING IN SIOUX FALLS | |
I4LK | 000P-351 | 6522 | 3/30/2017 | 18851.520 | SPRAYING OF NOXIOUS WEEDS IN HUGHES, HYDE AND SULLY COUNTIES | |
I4LM | 000P-351 | 6530 | 3/30/2017 | 18957.100 | SPRAYING OF NOXIOUS WEEDS IN LYMAN AND STANLEY COUNTIES | |
I4YV | 020-372 | 7818 | 11/2/2018 | 62256.110 | Inslope Erosion Repair & Downspout Replacement | |
I4YW | 020-372 | 9565 | 4/11/2024 | 145480.650 | Bank Stabilization | |
I5AC | 090 W-451 | 7676 | 6/12/2018 | 63306.820 | Channel repair | |
I5C7 | 000I-289 | 7650 | 5/30/2018 | 60060.320 | Materials & installation supervisor for Move Over signs | |
I5EC | 000P-251 | 7748 | 8/14/2018 | 71297.470 | Guardrail repair | |
I5FF | 2741S | 7867 | 11/28/2018 | 23750.000 | Sand stockpile | |
I5TK | 000P-251 | 8168 | 9/5/2019 | 143990.470 | Guardrail repair | |
I5WD | 000I-271 | 8297 | 3/12/2020 | 302550.000 | 2020 Weed spraying | |
I67A | 000P-251 | 8473 | 9/28/2020 | 182744.110 | Guardrail repair | |
I6HC | 0009-291 | 8675 | 4/28/2021 | 16832.340 | Surveillance System Installation | |
I6HK | 000P-352 | 8746 | 7/15/2021 | 10500.000 | Remove toilet vaults | |
I6HL | 0009-253 | 8720 | 5/21/2021 | 16720.000 | Pickup & dispose of roadkill deer | |
I6HN | 0009-252 | 8715 | 5/21/2021 | 11732.000 | Pickup & dispose of roadkill deer | |
I6HQ | 0009-271 | 8714 | 5/21/2021 | 20532.000 | Pickup & dispose of roadkill deer | |
I6HT | 0009-271 | 8728 | 5/21/2021 | 8750.000 | Pickup & dispose of roadkill deer | |
I6HV | 0009-292 | 8725 | 5/21/2021 | 19367.000 | Pickup & dispose of roadkill deer | |
I6HX | 0009-251 | 8702 | 5/21/2021 | 27225.000 | Pickup & dispose of roadkill deer | |
I6JW | 000P-251 | 8781 | 9/9/2021 | 188796.110 | Guardrail repair | |
I6KX | 000P-271 | 8809 | 12/15/2021 | 5100.000 | Street Sweeping | |
I6KY | 000N-351 | 8966 | 5/18/2022 | 324341.000 | Snow fence | |
I6L2 | 000I-391 | 8959 | 5/13/2022 | 194275.500 | Guardrail Repair | |
I6L3 | 000I-391 | 8976 | 5/25/2022 | 28000.000 | Road Kill and Debris Pickup | |
I6L4 | 000P-392 | 8977 | 5/25/2022 | 28000.000 | Road Kill and Debris Pickup | |
I6L6 | 000P-391 | 9006 | 5/25/2022 | 13200.000 | Road Kill and Debris Pickup | |
I6MR | 000P-151 | 8983 | 6/1/2022 | 14185.000 | Repair Traffic Signal | |
I6RC | 4 10C311( ) | 8949 | 4/27/2022 | 280400.000 | AC paving | |
I6T9 | 000P-251 | 8889 | 3/28/2022 | 20000.000 | Roadkill deer pickup | |
I6TA | 000P-251 | 8888 | 3/28/2022 | 20000.000 | Roadkill deer pickup | |
I6TF | 190 N-468 | 9788 | 2/18/2025 | 154772.000 | Replace failing brackets for for signs attached to the bridge | |
I6U8 | 000P-392 | 8951 | 5/1/2022 | 5280.000 | Broom and clean through Martin | |
I6UA | 0009-371 | 8992 | 5/24/2022 | 16548.000 | Mobridge Area Roadkill Pickup - East River Routes | |
I6UC | 0009-371 | 8993 | 5/24/2022 | 26978.000 | Pickup roadkill deer | |
I6UE | 000P-392 | 8952 | 5/2/2022 | 1600.000 | Brooming through Colome | |
I6UL | 000P-251 | 9022 | 7/21/2022 | 2700.000 | Sweep curb & gutter | |
I6UM | 000N-253 | 9024 | 7/21/2022 | 8000.000 | Sweep, sand, plow & blade | |
I6UQ | 000N-251 | 9023 | 7/21/2022 | 2900.000 | Sweep curb & gutter | |
I6UT | 000N-252 | 9025 | 7/21/2022 | 2500.000 | Snow Removal | |
I6UU | 000P-252 | 9026 | 7/21/2022 | 1700.000 | Sweep curb & gutter | |
I6UV | 000P-252 | 9027 | 7/21/2022 | 9000.000 | Sweep curb & gutter | |
I6UW | 000P-251 | 9028 | 7/21/2022 | 3300.000 | Sweep curb & gutter | |
I6UX | 1806-251 | 9029 | 7/21/2022 | 7025.000 | Blading gravel portion | |
I6V1 | 090 EF-253 | 9030 | 7/21/2022 | 3225.000 | Blading | |
I6VX | 000I-289 | 9031 | 7/21/2022 | 219439.500 | Sign repair | |
I6VY | 000P-251 | 9049 | 9/6/2022 | 204053.440 | Guardrail repair | |
I6W2 | 000I-271 | 9048 | 9/6/2022 | 480349.800 | Guardrail repair | |
I6WW | 090 E-288 | 9052 | 9/23/2022 | 57002.400 | Pre-Purchase pre-stressed girders for bridge hit repair | |
I6XP | 000P-392 | 9243 | 4/27/2023 | 4000.000 | Brooming of State Highway within Colome City Limits
| |
I6XQ | 000P-392 | 9255 | 5/5/2023 | 5280.000 | Brooming of State Highway within Martin City Limits
| |
I6XU | 0009-271 | 9281 | 5/23/2023 | 981367.180 | On-Call Concrete Pavement Repair in the Sioux Falls Area | |
I6Y9 | 000I-271 | 9161 | 2/22/2023 | 554787.900 | Mowing | |
I6YK | 0009-253 | 9104 | 12/5/2022 | 7610.000 | Deer Pickup in Section 1 | |
I71E | 000N-352 | 9176 | 3/8/2023 | 12764.400 | Weed Spraying - Unit 352 | |
I74E | 000I-391 | 9307 | 6/6/2023 | 240296.200 | Guardrail repair | |
I75Y | 029 N-291 | 9337 | 8/3/2023 | 188936.440 | PCCP Blow-Up Repair | |
I76M | 000P-191 | 9230 | 4/12/2023 | 27402.000 | Weed spraying | |
I76R | 000P-191 | 9228 | 4/12/2023 | 27332.000 | Weed spraying | |
I76U | 000P-191 | 9227 | 4/12/2023 | 24511.000 | Weed spraying | |
I76W | 000P-192 | 9226 | 4/12/2023 | 37838.000 | Weed spraying | |
I77Y | 0009-271 | 9343 | 8/10/2023 | 691226.400 | Resurfacing & Lighting in Sioux Falls Complex Lot | |
I79A | 000P-491 | 9302 | 6/6/2023 | 39000.000 | Deer road kill pickup | |
I79H | 000P-151 | 9323 | 6/21/2023 | 97750.000 | Road Kill Deer Pickup in Aberdeen Area | |
I79M | 0009-169 | 9321 | 6/21/2023 | 99400.000 | Pickup and Dispose of Roadkill Deer in Huron Area | |
I79N | 000I-171 | 9322 | 6/21/2023 | 96000.000 | Pickup and Dispose of Roadkill Deer in Watertown Area | |
I79W | 000P-251 | 9353 | 6/23/2023 | 2700.000 | Sweep Curb and Gutter | |
I79X | 000N-253 | 9352 | 6/23/2023 | 8000.000 | Sweep, sand, and plow | |
I7A1 | 000N-251 | 9351 | 6/23/2023 | 2900.000 | Sweep curb and gutter | |
I7A3 | 000P-252 | 9356 | 6/23/2023 | 3000.000 | sweep curb and gutter | |
I7A4 | 000P-252 | 9355 | 6/23/2023 | 9000.000 | Sweep curb and gutter | |
I7A5 | 000P-251 | 9354 | 6/23/2023 | 3600.000 | Sweep curb and gutter | |
I7A6 | 090EF-253 | 9350 | 6/23/2023 | 3225.000 | blade service roads | |
I7A9 | 1806-251 | 9360 | 6/23/2023 | 7025.000 | blading gravel portion | |
I7AK | 000N-252 | 9349 | 8/24/2023 | 2500.000 | snow removal | |
I7AP | 0009-271 | 9329 | 7/5/2023 | 22932.000 | Roadkill Pickup in Section 3 of Mitchell Region | |
I7AR | 0009-252 | 9335 | 7/5/2023 | 15232.000 | Roadkill Pickup in Section 2 of Mitchell Region | |
I7AU | 000I-271 | 9377 | 10/5/2023 | 150000.000 | Sweeping FY24 | |
I7AV | 000I-271 | 9378 | 10/6/2023 | 156250.000 | Sweeping FY25 | |
I7C1 | 000I-271 | 9379 | 10/6/2023 | 162500.000 | Sweeping FY26 | |
I7C8 | 000P-251 | 9392 | 10/24/2023 | 283501.360 | Guardrail Repair | |
I7CC | 000I-271 | 9393 | 10/24/2023 | 630196.200 | Guardrail Repair | |
I7CG | 0009-271 | 9439 | 1/2/2024 | 86460.000 | Roadway Lighting Maintenance | |
I7CN | 2229N-288 | 9440 | 12/21/2023 | 122883.000 | install an external dry standpipe system | |
I7CQ | 0009-391 | 9564 | 4/22/2024 | 542133.400 | Asphalt Surfacing, Asphalt Repair, Asphalt Surface Treatment & Fog Seal in Winner Area Yard
| |
I7CT | 000I-391 | 9630 | 5/30/2024 | 24500.000 | Road Kill Pickup | |
I7CU | 018-392 | 9625 | 5/30/2024 | 25000.000 | Road Kill and Debris Pickup | |
I7CW | 083-391 | 9631 | 5/30/2024 | 9500.000 | Road Kill Pickup | |
I7CX | 083-392 | 9532 | 3/19/2024 | 39369.000 | Maintenance of Lighting System at Horse Creek
| |
I7D0 | 000N-392 | 9525 | 3/21/2024 | 89550.000 | Weed Spraying | |
I7D5 | 018-392 | 9474 | 2/14/2024 | 6400.000 | US 18 through Colome, SD
| |
I7D6 | 018-392 | 9496 | 3/7/2024 | 5280.000 | Brooming of State Highway within Martin City Limits
| |
I7D7 | 090-391 | 9566 | 4/11/2024 | 38785.000 | Place Colored PCC at Belvidere Rest Area
| |
I7DF | 000P-271 | 9405 | 11/27/2023 | 5000.000 | Street Sweeping FY24 | |
I7DK | 037-191 | 9430 | 12/7/2023 | 17857.180 | Haul and Place Riprap | |
I7DL | 000N-271 | 9424 | 12/15/2023 | 7050.000 | Street Sweeping FY24 | |
I7DN | 000I-391 | 9620 | 6/4/2024 | 257265.300 | Guardrail Repair | |
I7DQ | 034-368 | 9598 | 5/21/2024 | 125260.400 | Cheyenne Deck Overlay | |
I7DU | 0009-271 | 9445 | 1/12/2024 | 10400.000 | snow removal, gravel surfacing and mowing | |
I7DV | 0009-271 | 9446 | 1/12/2024 | 10500.000 | snow removal, gravel surfacing and mowing | |
I7DW | 0009-271 | 9447 | 1/12/2024 | 10600.000 | snow removal, gravel surfacing and mowing | |
I7E8 | 0009-168 | 9489 | 2/22/2024 | 136550.000 | Bridge Cleaning and Sweeping | |
I7E9 | 000I-171 | 9544 | 4/5/2024 | 10784.300 | Vegetation Management of Pollinator Plots | |
I7EC | 231-452 | 9567 | 3/26/2024 | 39859.500 | Dip Repair, SD231 NB | |
I7EG | 385-451 | 9670 | 8/15/2024 | 52300.000 | Erosion Repair | |
I7ER | 231 N-452 | 9563 | 4/18/2024 | 189413.400 | Replace Median Drainage Structures and Pipe Culvert | |
I7EU | 000P-191 | 9546 | 4/5/2024 | 26560.750 | Weed Spraying | |
I7EW | 000P-192 | 9504 | 3/8/2024 | 79501.000 | Weed Spraying | |
I7EY | 000P-191 | 9505 | 3/8/2024 | 30431.000 | Weed Spraying | |
I7F1 | 000P-191 | 9506 | 3/8/2024 | 28229.000 | Weed Spraying | |
I7F3 | 000P-192 | 9507 | 3/8/2024 | 39470.000 | Weed Spraying | |
I7GH | 000I-172 | 9545 | 4/5/2024 | 56610.400 | Weed Spraying | |
I7GL | 000N-151 | 9512 | 3/20/2024 | 57907.200 | Weed Spraying | |
I7GQ | 000N-151 | 9513 | 3/20/2024 | 41372.800 | Weed Spraying | |
I7GT | 000N-152 | 9514 | 3/20/2024 | 34193.600 | Weed Spraying | |
I7GV | 000N-152 | 9515 | 3/20/2024 | 28805.000 | Weed Spraying | |
I7GX | 000N-151 | 9516 | 3/20/2024 | 33110.800 | Weed Spraying | |
I7GY | 000N-152 | 9517 | 3/20/2024 | 34960.400 | Weed Spraying | |
I7HQ | 000N-371 | 9528 | 3/21/2024 | 50930.400 | Weed Spraying | |
I7J0 | 0009-500 | 9617 | 4/9/2024 | 849333.150 | Furnish and Deliver Type D Bicycle Friendly Grates Statewide | |
I7JK | 000P-452 | 9604 | 5/14/2024 | 87750.000 | Roadkill pickup | |
I7JL | 000I-452 | 9594 | 5/14/2024 | 28000.000 | Roadkill deer pickup | |
I7JN | 018-251 | 9581 | 4/25/2024 | 329520.000 | Asphalt Patching | |
I7K3 | 014A-451 | 9602 | 5/16/2024 | 208655.280 | Erosion Repair, Curb and Gutter, Pipe Work | |
I7K4 | 000I-469 | 9629 | 6/4/2024 | 30155.920 | DOT Utility Locates | |
I7K7 | 000I-469 | 9614 | 5/23/2024 | 383243.450 | Guardrail Maintenance | |
I7KC | 000I-171 | 9621 | 5/30/2024 | 396487.100 | FY 2025 Guardrail Repair | |
I7KD | 0009-371 | 9593 | 5/1/2024 | 215000.000 | Contractor furnished mix | |
I7KF | 273-391 | 9578 | 4/30/2024 | 150000.000 | Hot mix asphalt patching | |
I7KG | 0009-451 | 9643 | 7/3/2024 | 311708.750 | Asphalt Paving | |
I7KH | 000P-151 | 9595 | 5/16/2024 | 12391.000 | Relocate Luminare Pole | |
I7KJ | 0009-351 | 9627 | 5/30/2024 | 19625.000 | Roadkill deer pickup | |
I7L0 | 000P-252 | 9674 | 8/22/2024 | 9000.000 | Street Sweeping | |
I7L1 | 000P-251 | 9675 | 8/22/2024 | 5250.000 | Street Sweeping | |
I7L2 | 000P-251 | 9671 | 8/22/2024 | 2700.000 | Street Sweeping | |
I7L3 | 000N-253 | 9695 | 9/30/2024 | 7650.000 | Street Sweeping, Blading, Plowing | |
I7L6 | 000N-251 | 9672 | 8/22/2024 | 2900.000 | Street Sweeping | |
I7L8 | 000N(252) | 9673 | 8/22/2024 | 2500.000 | Street Sweeping | |
I7L9 | 1806-251 | 9676 | 8/22/2024 | 7375.000 | Blading gravel portion | |
I7LD | 090EF-253 | 9677 | 8/22/2024 | 3650.000 | blade service roads | |
I7LG | 0009-253 | 9612 | 5/23/2024 | 28800.000 | Road Kill Pickup | |
I7LJ | 0009-271 | 9609 | 5/23/2024 | 11750.000 | Road Kill Pickup | |
I7LL | 0009-292 | 9610 | 5/23/2024 | 23300.000 | Road Kill Pickup | |
I7LN | 0009-251 | 9611 | 5/23/2024 | 14514.000 | Road Kill Pickup | |
I7LQ | 0009-251 | 9607 | 5/29/2024 | 14514.000 | road kill pickup | |
I7LU | 000P-491 | 9637 | 6/18/2024 | 21500.000 | road kill pickup | |
I7LX | 019-271 | 9615 | 5/31/2024 | 646400.000 | Machine Asphalt Patching | |
I7M0 | 000P-351 | 9624 | 6/5/2024 | 8000.000 | Brooming | |
I7M1 | 000P-271 | 9634 | 6/4/2024 | 5200.000 | Street Sweeping | |
I7M2 | 000P-271 | 9635 | 6/4/2024 | 5200.000 | Street Sweeping | |
I7M3 | 000P-271 | 9636 | 6/4/2024 | 5200.000 | Street Sweeping | |
I7M5 | 248-391 | 9618 | 5/1/2024 | 6500.000 | Replacement of Mainline Culvert | |
I7MH | 000P-251 | 9669 | 8/19/2024 | 303448.250 | Guardrail Repair | |
I7ML | 000I-271 | 9665 | 8/19/2024 | 682943.700 | Guardrail Repair | |
I7MQ | 000I-291 | 9738 | 12/19/2024 | 57000.000 | Night Winter Inspection / Snow & Ice Control Service | |
I7MR | 000I-291 | 9739 | 12/19/2024 | 57000.000 | Night Winter Inspection / Snow & Ice Control | |
I7MT | 000I-291 | 9740 | 12/19/2024 | 57000.000 | Night Winter Inspection / Snow & Ice Control | |
I7MV | 000N-291 | 9667 | 8/19/2024 | 415417.400 | Repair Guardrail | |
I7N9 | 000I-291 | 9707 | 11/7/2024 | 196642.200 | Corn stock and debris removal | |
I7NX | 047-168 | 9750 | 1/10/2025 | 211250.000 | retrofitting a structure with chain link fencing | |
I7PA | 000N-392 | 9794 | 3/12/2025 | 4000.000 | Brooming of State Highway within Colome City Limits
| |
I7PC | 000P-392 | 9793 | 3/12/2025 | 5280.000 | Street Sweeping | |
I7PK | 016-491 | 9696 | 9/23/2024 | 113261.250 | High Friction Surface Treatment | |
I7PT | 010-152 | 9795 | 3/10/2025 | 229922.100 | Clean and Line Culverts | |
I7PW | 000P-151 | 9759 | 1/17/2025 | 12956.000 | Pre-purchase Signal Pole | |
I7PX | 0009-168 | 9773 | 1/31/2025 | 44100.000 | Bridge Cleaning and Sweeping | |
I7PY | 0009-168 | 9774 | 1/31/2025 | 41745.000 | Bridge Cleaning and Sweeping | |
I7Q0 | 0009-168 | 9772 | 1/31/2025 | 160755.000 | Bridge Cleaning and Sweeping | |
I808 | NH 0012(00)233 | 1554 | 3/18/2004 | 130752.090 | ASPHALT SURFACE TREATMENT - BOWDLE TO ROSCOE | |
IOBY | 000I -391 | 2170 | 5/10/2006 | 11960.000 | ROADKILL & DEBRIS PICKUP FROM ON I-90 FROM MRM131 TO MRM251 | |
X01E | 2010 01( ) | 3269 | 1/27/2010 | 609306.840 | Sanitary Sewer Outfall Line Detour Line & Permanent Line Upgrade | |
X02F | 2013 1A( ) | 4709 | 7/17/2014 | 152026.000 | Water and Sanitary Sewer Upgrades | |
X02P | 12 2051( ) | 6125 | 10/5/2016 | 1518351.270 | | |
X02Q | 12 2022( ) | 4652 | 10/18/2017 | 1088200.200 | Water Main and Sanitary Sewer Improvements | |
X02X | 13 2125( ) | 6039 | 2/24/2016 | 111451.000 | City Utility Improvements | |
X02Y | 800813 ( ) | 6092 | 2/6/2019 | 1966600.000 | Watermain Relocation | |
X03K | 2016 02( ) | 5123 | 2/17/2016 | 654839.670 | Water Main Improvements, Sewer Manhole Adjustments and Sidewalk Extensions | |
X03L | 13 2139( ) | 5247 | 2/24/2016 | 2218751.020 | Sanitary Sewer, Water Main, and Landscaping | |
X03M | 14 2170( ) | 6852 | 6/27/2018 | 4337432.740 | | |
X03P | 14.2030.C02 ( ) | 6033 | 3/2/2016 | 545151.000 | Water Main Improvements | |
X03T | 12 2053( ) | 5067 | 7/15/2015 | 1720517.980 | Water Main and Sanitary Sewer Improvements | |
X03W | CIP 50904( ) | 7846 | 2/5/2020 | 998775.000 | | |
X03Y | CIP 11013( ) | 6093 | 2/6/2019 | 662662.000 | Watermain Installation | |
X04E | 2019 1( ) | 7504 | 12/12/2018 | 1269361.930 | | |
X04J | 662070 ( ) | 6266 | 1/18/2017 | 768614.310 | Water Main | |
X04K | CP 1805( ) | 7365 | 12/6/2017 | 101278.600 | City Utils | |
X04L | CIP 11064( ) | 6723 | 7/19/2017 | 636363.630 | | |
X04P | 17 1025( ) | 7703 | 12/12/2018 | 1235595.670 | | |
X04Q | WW 2001( ) | 8051 | 10/2/2019 | 1014527.600 | | |
X04R | CIP 51108( ) | 8239 | 11/4/2020 | 707279.230 | Sanitary Sewer and Water Main Replacement | |
X04T | CIP 11016( ) | 7762 | 1/23/2019 | 667099.030 | | |
X05D | 2128119 ( ) | 8712 | 12/1/2021 | 928523.600 | | |
X05G | CIP 51212( ) | 8778 | 1/19/2022 | 781073.420 | Replace Water and Sewer Mains | |
X05H | 14740 ( ) | 8618 | 9/1/2021 | 1300785.950 | | |
X05L | 1804 00330( ) | 8498 | 1/20/2021 | 696093.500 | | |
X05M | 11064 ( ) | 8810 | 4/6/2022 | 1769769.690 | Water Main & Sanitary Sewer | |
X05R | CIP 11098( ) | 8963 | 12/7/2022 | 2065050.550 | Watermain & Sanitary Sewer | |
X05T | 2024 01( ) | 9381 | 3/20/2024 | 4785000.000 | Water Main Replacement, Associated Service Lines & Sanitary Sewer Spot Repairs; Downtown Streetscape Improvements and South E | |
X05U | CIP 11001( ) | 8558 | 4/21/2021 | 1554070.700 | | |
X05V | 2119 ( ) | 8733 | 12/1/2021 | 521617.250 | | |
X05W | 436 ( ) | 9652 | 12/11/2024 | 5865525.000 | Water Main Improvement and Sewer Manhole Adjustments | |
X05Y | CIP 11120( ) | 9053 | 5/3/2023 | 1716653.300 | Watermain & Sanitary Sewer | |
X06A | CIP 11100( ) | 9687 | 2/19/2025 | 1888888.880 | Water and Sanitary Sewer | |
X06D | 2021 45( ) | 9325 | 11/8/2023 | 3650044.010 | Water & Sanitary Sewer Upgrades | |
X06E | 18-0022 (01) | 9418 | 2/27/2024 | 324999.990 | Watermain and Sanitary Sewer Line Adjustments | |
X06G | CIP 51194( ) | 9543 | 6/26/2024 | 89743.000 | Water Main Lowering | |
X06L | 2211 01441( ) | 9548 | 12/4/2024 | 1921124.840 | Replace Water Line | |
X06M | 21005951 ( ) | 9633 | 11/20/2024 | 562962.800 | Replacement of Sanitary Sewer Crossings, Installation of Sanitary Sewer Services, Water Main, Water Services and Ditch Gradin | |
X06Q | CIP 11120( ) | 9664 | 2/12/2025 | 723901.000 | Watermain and Sanitary Sewer | |
X126 | WW0601 | 1937 | 2/8/2006 | 1056425.450 | Sanitary Sewer & Watermain | |